When implementing pallet racking systems in your warehouse, you should follow the Health and Safety at Work etc. Act, PUWER, relevant British and European standards such as BS EN 15635, and recognised SEMA guidance. Compliance also requires competent installation, documented risk assessments, suitable protection and load notices, staff training, and regular inspections with prompt action on any damage.
UK compliance for pallet racking systems is based on a combination of health and safety legislation, risk assessment, recognised technical standards and competent inspection. The main references are the Health and Safety at Work etc. Act, the Management of Health and Safety at Work Regulations, the Provision and Use of Work Equipment Regulations, BS EN 15635 and relevant SEMA guidance. Compliance also depends on selecting a suitable system, ensuring competent installation, displaying accurate load information, training employees and acting promptly when damage is identified.
Legislation and recognised standards
There is no single law covering every aspect of pallet racking. Instead, employers must manage the risks associated with storage equipment as part of their wider duties to protect employees and others affected by warehouse operations.
- Health and Safety at Work etc. Act: requires employers to provide, so far as reasonably practicable, a safe workplace, safe equipment, suitable systems of work and appropriate information, instruction and training.
- Management of Health and Safety at Work Regulations: require suitable and sufficient risk assessments, arrangements for managing safety, competent assistance and appropriate procedures for foreseeable emergencies.
- Provision and Use of Work Equipment Regulations: apply because pallet racking is work equipment used during warehouse operations. Equipment must be suitable for its intended purpose, properly maintained and inspected where deterioration could create a significant risk.
- BS EN 15635: provides the principal guidance for the use and maintenance of steel static storage systems. It covers responsibilities, safe operation, damage assessment, inspections, reporting and corrective action.
- BS EN 15629, BS EN 15620 and BS EN 15512: address specification, application, tolerances, clearances and structural design. The relevant requirements should be considered when a system is designed, supplied, altered or extended.
- HSE guidance: HSG76, Warehousing and Storage, provides practical guidance on storage equipment, workplace transport, traffic routes, loading, housekeeping and safe working arrangements.
British Standards are not legislation in themselves. However, they are widely recognised methods of demonstrating that risks have been properly considered. An alternative approach may be acceptable where it provides an equivalent or better level of safety, but the reasoning should be documented and supported by competent technical advice.
Design and specification duties
Before installing a pallet racking system, the proposed layout and specification should reflect the building, the goods, the handling equipment and the way the warehouse will operate. The design should account for pallet dimensions and condition, unit loads, beam levels, bay widths, aisle clearances, forklift characteristics, floor capacity, impact risks and any site-specific hazards.
The supplier or designer should provide sufficient technical information to confirm the intended configuration and safe working loads. This normally includes the layout, frame and beam details, anchoring requirements, protection measures, tolerances and load limitations. Any unusual loads, non-standard pallets, changes in operating equipment or storage of unstable goods should be raised before installation rather than managed informally afterwards.
The supporting floor and building structure must also be suitable. Floor condition, level tolerances, slab capacity, obstructions, lighting, fire arrangements and escape routes should be checked during planning. Where the installation affects the building or requires approval under other legal requirements, the appropriate designer, building professional or enforcing authority should be consulted.
Competent installation and handover
Installation should be completed by people with the necessary training, knowledge and practical experience. Frames must be correctly positioned, plumbed, connected and anchored in accordance with the design and manufacturer’s instructions. Beams, locking devices, bracing, protection and accessories must be fitted correctly, and damaged or unsuitable components must not be used.
The completed installation should be checked before it is put into service. Handover information should include the final layout, safe working load information, inspection arrangements, maintenance requirements and any restrictions on use. If the installed system differs from the original design, the change should be reviewed by a competent person and recorded.
Load notices and operating controls
Each pallet racking system should have clearly displayed load notices in positions where operators can readily see them. The information should match the actual installation and identify relevant limits, such as bay loads, beam loads, pallet positions and any restrictions applying to the configuration.
Operators should understand that a load notice is not permission to exceed the stated limit. Pallets should be stable, suitable for the beam arrangement and positioned correctly. Loads should not project into aisles or interfere with sprinklers, lighting, doors, fire equipment or escape routes. Changes to beam levels, bay arrangements, load types or handling equipment should not be made without a design and safety review.
Risk assessment and warehouse controls
The risk assessment should cover more than the structural capacity of the system. It should consider forklift and pedestrian interaction, reversing, visibility, falling objects, damaged pallets, manual handling, access at height, housekeeping, fire precautions and emergency arrangements. Traffic routes should be clearly defined, maintained and separated from pedestrians wherever reasonably practicable.
Suitable end-of-aisle protection, frame guards, barriers, column protection or other controls may be required depending on the layout and impact risk. Protection should be compatible with the system and should not obstruct inspections or create additional hazards. Lighting and aisle clearances should allow operators to place and retrieve loads without striking the structure.
Employees, agency workers and contractors should receive information and instruction relevant to their tasks. Forklift operators require appropriate training for the equipment they use, while other warehouse staff need to know the safe loading rules, damage-reporting process and areas where access is restricted.
Inspection and damage reporting
BS EN 15635 distinguishes between routine visual checks, formal inspections and expert inspections. The employer should appoint a person with suitable knowledge and authority to manage the inspection process. Routine visual inspections should take place at intervals no greater than one week, or more frequently where the risk assessment requires it. An expert inspection should be carried out at intervals no greater than twelve months, unless a competent person determines that a shorter interval is necessary.
Inspections should look for bent or distorted frames, damaged uprights, beams that have moved or become unlocked, missing components, loose anchors, damaged bracing, overloaded locations, impact protection failures and changes to the original configuration. The condition of floors, pallets, load stability, aisle clearances and load notices should also be considered.
Every employee should know how to report damage immediately. Under the BS EN 15635 approach, serious damage should result in the affected area being unloaded and taken out of use until it has been made safe. Less serious damage should still be recorded, assessed and repaired within an appropriate timescale. Repairs should use approved components and methods; straightening damaged structural members or improvising with unsuitable parts can compromise the design.
Inspection records should identify the date, location, findings, risk classification, immediate controls, person responsible and completion of corrective action. Keeping a clear audit trail demonstrates that the system is actively managed rather than inspected only after an incident.
Management of alterations and repairs
Moving beams, removing bracing, replacing components with different parts, changing aisle widths or adding bays can affect the structural design. These changes should be approved by a competent designer or the original supplier where appropriate. The load notice and layout documentation must be updated whenever the approved configuration changes.
Repairs should be completed promptly by suitably experienced personnel. If there is uncertainty about the severity of damage, the affected location should be isolated until it has been assessed. A repair is not complete until the system has been checked, the area released for use and the relevant records updated.
Practical compliance checklist
- Complete and document a suitable risk assessment before use.
- Confirm that the design suits the building, floor, loads, pallets and handling equipment.
- Use competent installers and retain installation and handover information.
- Display accurate load notices for the installed configuration.
- Provide suitable protection, traffic controls, lighting and clearances.
- Train employees in safe loading, unloading, reporting and emergency procedures.
- Carry out routine visual checks and arrange an expert inspection at least annually, or more often where risk demands it.
- Record defects, isolate seriously damaged areas and complete corrective action promptly.
- Obtain approval before altering, extending or reconfiguring the system.
- Retain inspection, repair, training, risk assessment and maintenance records.
For a warehouse already in operation, the most effective starting point is a documented review against the current layout and use. This should compare the installed configuration with the load notices and available design information, examine the condition of the equipment and confirm that inspection, training and damage-reporting arrangements are working in practice. Where documentation is missing or the system has been altered over time, a competent inspection and technical assessment can establish the information needed to manage it safely.

Accurate load notices are a key part of pallet racking compliance because they show warehouse operators the maximum loads the installed system can safely support. The notice should match the actual layout, beam levels, components and pallet configuration, and must be clearly displayed where it can be read during loading and unloading.
Do not rely on a load notice if the system has been altered, damaged or loaded differently from its original design. Changes to beam positions, bay arrangements, pallets or handling equipment should be reviewed by a competent person before use, with the notice and supporting records updated where necessary. Operators should also know how to report damage, instability or missing information immediately.
Arrange a pallet racking compliance inspection